Repair and Replace Fire Systems, Bldg. 2081 | JBSA/Lackland-Kelly | San Antonio, TX
August 15, 2017
Performance Oriented Contract Award (POCA) for Renovations and New Construction | Tinker AFB, OK
August 15, 2017

Protected Distribution System Extension - Bldg. 12010 | Fort Hood, TX

Project Description:

GD was selected to serve as prime contractor on this firm fixed price contract by the Mission and Installation Contracting Command at Fort Hood. The project scope included extension of the protected distribution system (PDS) in Building 12010. GD removed the existing PDS from the current safe location and relocated it to the pay cage. The existing safe, which was over 600 pounds, was also removed and relocated. Thereafter, the new safe, also well over 600 lbs, was moved into the Building 12010, the new PDS was installed, and all SIPR CTA-6/RJ-45 existing cabling throughout the building was replaced.


Services Provided:

General Construction - GD was prime consultant.

Date of Construction Start:

October 2013

Date of Construction Finish:

December 2013

Construction Contract Value:

$27,679